(1)
Kloudová, D. DOES USING NAIRU IN THE PRODUCTION FUNCTION INFLUENCE ESTIMATION OF POTENTIAL OUTPUT AND OUTPUT GAP?. Int. J. Econ. Sci. 2016, 5 (2), 1-21. https://doi.org/10.20472/ES.2016.5.2.001.